Skip to content

Project Settings

Gloabal settings that are valid over the entire project. The settings can be locked by the admin by clicking on Lock Setting on the different settings pages.

Click to save the changes.

A detaild overview of the different settings can be found in the following sections:

General

Data Integration

.Mon

Grid

Short Circuit

Protection

D-A-CH-CZ

Hosting Capacity

Connection Request

.Connect

N-1

Reliability

.Sim

Future Scenario

Power Flow